|
Fisher brewery Logistics
Fisher’s goal : structure its logistics in order to avoid a restaurant stoppage and optimize flow with its clientele.
The implemented logistic solution to optimize flow between the FISCHER brewery and the totality of its clientele concluded with the construction of a 30,000 m² building in Strasburg.
GONDRAND knew how to point out its qualities in the report in order to create and validate a logistic solution project adapted to the needs of our client and which responds, technically and qualitatively, to Fisher’s problems.
This site obtained the ISO 9001 certification -version 2000- in all its activities.
.
 |
Specific Center
Fischer brewery (67)..
30,000 m² to ensure Fischer’s complete logistics. |
|
 |
Specific Center
Fischer brewery (67)..
Consigned bottle return management. |
|
 |
Specific Center
Fischer brewery (67)..
National distribution management. |
|
 |
Specific Center
Fischer brewery (67)..
Transshipment warehouse area. |
|
|